Our Products

Tektronix 013-0102-00 Long Lead Transistor Adapter

In Stock: 1

Price: $100.00

Qty: 

ships immediately

The Tektronix 013-0102-00 is a Long Lead Test Fixture.  The 013-0102-00 can be used with the Tektronix 576 and 577 curve tracers.